In connection with the scheduled maintenance of the runway and lighting equipment of the Nursultan Nazarbayev International Airport, the central schedule of departures and arrivals of QAZAQ AIR flights will be changed from July 21 to August 09. The airport will carry out repair work from 11:00 to 18:00 daily until the end of the renovation.
In this regard, we ask all passengers of QAZAQ AIR to arrive in advance for check-in at the airport and, if necessary, check with the Call center for full information about the time of departure / arrival of flights. Please be understanding. We apologize for the temporary inconvenience at the base airport of QAZAQ AIR.